Our Projects
Selebi Mine
Selkirk Mine
Selebi Mine
Selkirk Mine
2025 CATALYSTS:
Innovative Value Growth Model
Drilling and Exploration Activities
SELEBI MINES
- Selebi North Underground Resource Expansion Drilling
- HINGE Drilling Between Selebi Mine Deposits
- Selebi Main Surface Drilling Program Targeting a Potential 3rd Zone
SELKIRK
- Resource Expansion Drilling Complete. Initial assays highlight scale and grade continuity
Ongoing Studies
METALLURGICAL TESTING
- Selebi Mines: Initial results confirm lower-cost recovery pathways and flowsheet optimization
- Selkirk: Variability testing advancing with sample from large diameter core
XRT ORE SORTING (“X-ray Transmission”)
- Selebi North: Initial tests deliver 15.2% increase of head grade demonstrating high recoveries and significant waste reduction
- Selebi Main and Selkirk: Pre-concentration studies underway
Data Driven Results
BHEM PRECISION TARGETING
- Selkirk BHEM results confirm effectiveness as a discovery tool; identified modeled plates down-plunge of MRE
CONTINUOUS ASSAY FLOW
- Ongoing assay releases from Selebi and Selkirk as results are received
ADVANCING TOWARDS UPDATED MRES
- Ongoing resampling, new drilling, and geophysics will support future MRE updates at both Selebi and Selkirk